A7 Road Closures — Permits & Works
Current and upcoming A7 road closures and roadworks. Permit references, promoters, and highway authority information.
About the A7
This page is tied to the A7 reference in Ordnance Survey’s OS Open Roads network for Great Britain. The route profile below is separate from the live closure records and helps identify the mapped road network this page covers.
Mapped length
94 mi · 152 km
Summed from classified OS road links, not a driving-distance estimate.
OS classification
A Road
Recorded in the verified route dataset for this road reference.
Dataset region
Scotland
Derived from the road network’s mapped reference coordinate.
Local reference
Hawick
Scottish Borders
Route context for A7 closures
The route’s mapped reference point falls in Scottish Borders, near Hawick. It is an orientation point, not a claimed route endpoint. The live list above remains the source for current and planned closure timings, permit details and affected locations.
Route reference data: Ordnance Survey OS Open Roads, a high-level Great Britain road network dataset.
29 closures found (filtered)
UK ClearRoute records · source times shownA7 — Live Statistics
Based on all 30 records for A7, including any hidden by the filters above.
By Severity
| Status | Map preview | Directions | Share | |
|---|---|---|---|---|
Selkirk | mediumMediumActiveActive NowStarted: 31 Aug 2026 08:30 Ends: 13 Sept 2026 17:00 | |||
Selkirk | mediumMediumActiveActive NowStarted: 31 Aug 2026 08:30 Ends: 1 Sept 2026 15:30 | |||
Selkirk | mediumMediumActiveActive NowStarted: 31 Aug 2026 08:30 Ends: 13 Sept 2026 17:00 | |||
Selkirk | mediumMediumActiveActive NowStarted: 31 Aug 2026 08:30 Ends: 13 Sept 2026 17:00 | |||
Selkirk | mediumMediumActiveActive NowStarted: 31 Aug 2026 08:30 Ends: 13 Sept 2026 17:00 | |||
Selkirk | mediumMediumActiveActive NowStarted: 31 Aug 2026 08:30 Ends: 1 Sept 2026 15:30 | |||
Selkirk | mediumMediumActiveActive NowStarted: 28 Aug 2026 07:00 Ends: 4 Sept 2026 16:00 | |||
Selkirk | mediumMediumActiveActive NowStarted: 28 Aug 2026 07:00 Ends: 4 Sept 2026 16:00 | |||
Selkirk | mediumMediumActiveActive NowStarted: 24 Aug 2026 19:00 Ends: 4 Sept 2026 15:30 | |||
Hawick | mediumMediumActiveActive NowStarted: 24 Aug 2026 08:30 Ends: 4 Sept 2026 14:30 | |||
Hawick | mediumMediumActiveActive NowStarted: 24 Aug 2026 08:30 Ends: 4 Sept 2026 14:30 | |||
Galashiels | mediumMediumActiveActive NowStarted: 24 Aug 2026 07:00 Ends: 14 Sept 2026 16:00 | |||
Galashiels | mediumMediumActiveActive NowStarted: 24 Aug 2026 07:00 Ends: 14 Sept 2026 16:00 | |||
Hawick | mediumMediumActiveActive NowStarted: 24 Aug 2026 06:00 Ends: 27 Sept 2026 22:59 | |||
Hawick | mediumMediumActiveActive NowStarted: 24 Aug 2026 06:00 Ends: 27 Sept 2026 22:59 | |||
Hawick | mediumMediumActiveActive NowStarted: 18 Aug 2026 19:14 Ends: — | |||
Hawick | mediumMediumActiveActive NowStarted: 14 Aug 2026 18:51 Ends: — | |||
Hawick | mediumMediumActiveActive NowStarted: 13 Aug 2026 18:37 Ends: — | |||
Hawick | mediumMediumActiveActive NowStarted: 12 Aug 2026 18:35 Ends: — | |||
Hawick | mediumMediumActiveActive NowStarted: 11 Aug 2026 18:39 Ends: — | |||
Hawick | mediumMediumActiveActive NowStarted: 10 Aug 2026 19:23 Ends: — | |||
Hawick | mediumMediumActiveActive NowStarted: 7 Aug 2026 18:36 Ends: — | |||
Hawick | mediumMediumActiveActive NowStarted: 6 Aug 2026 18:35 Ends: — | |||
Hawick | mediumMediumActiveActive NowStarted: 5 Aug 2026 18:38 Ends: — | |||
Hawick | mediumMediumActiveActive NowStarted: 4 Aug 2026 18:33 Ends: — |
Get email alerts for A7
Road Closures on the A7
Road Closures UK shows 30 current and planned disruption records associated with the A7, sourced from Street Manager and National Highways. The record type distinguishes full closures from roadworks and lane restrictions where supplied. Each record includes the available permit reference, promoter, responsible highway authority and scheduled dates. Sign up for free email alerts for new matching records.
What the current A7 records show
Of the 30 records currently published for A7, 29 are under way now and 1 is scheduled to start later. Locations affected include Hawick, Selkirk, Galashiels and Brampton. Recorded severity is medium (30). The latest scheduled end date on this page is 31 March.
Live closure details
Open a closure for its permit reference, exact timings and affected-road information.
- The A7 Selkirk is closed between High Street and Tower Street, due to overnight roadworks. (Edinburgh)
- The A7 is currently closed in both directions at Footsburn due to essential overnight roadworks. Motorists are advised t (Dumfries)
- The A7 is closed in both directions at Footsburn due to essential overnight roadworks. (Dumfries)
- The A7 is closed in both directions at Footsburn due to essential overnight roadworks. (Dumfries)
- The A7 is closed in both directions at Footsburn due to essential overnight roadworks. (Dumfries)
- The A7 is currently closed in both directions at Footsburn due to essential roadworks. (Dumfries)
- The A7 is closed in both directions at Footsburn, north of Langholm, due to overnight roadworks. (Dumfries)
- Due to overnight roadworks the A7 is closed in both directions, south of Ashkirk. (Edinburgh)
- The A7 south of Ashkirk is closed in both directions to all traffic, due to overnight roadworks. (Edinburgh)
- The A7 at Ashkirk is closed in both directions, due to essential overnight roadworks. (Edinburgh)