Temporary road closure
Church View, Heighington Middlesbrough
— —
— — — high High ActiveActive Now Started: —
Ends: —Temporary road closure to allow road surfacing works Middlesbrough
— —
— — — high High ActiveActive Now Started: —
Ends: —Road closure required for safe access to engineer for pole test. Warrington
— —
— — — high High ActiveActive Now Started: —
Ends: —Temporary road closure Middlesbrough
— —
— — — high High ActiveActive Now Started: —
Ends: —Temporary road closure for works to install a LV electric cable Middlesbrough
— —
— — — high High ActiveActive Now Started: —
Ends: —TM ONLY - Road closure provided by Pioneer, required to replace poles either side of the road and replacing the conductor. Warrington
— —
— — — high High ActiveActive Now Started: —
Ends: —road closure require for safe pole replacement Liverpool
— —
— — — high High ActiveActive Now Started: —
Ends: —Temporary road closure to allow sewer lining works Middlesbrough
— —
— — — high High ActiveActive Now Started: —
Ends: —Temporary Cycle Lane Closure Middlesbrough
— —
— — — high High ActiveActive Now Started: —
Ends: —ROAD CLOSURE REQUIRED FOR POLE TEST. Warrington
— —
— — — high High ActiveActive Now Started: —
Ends: —ROAD CLOSURE REQUIRED FOR ONE POLE TESTING. Cheltenham
— —
— — — high High ActiveActive Now Started: —
Ends: —Temporary road closure to allow sewer repair works Middlesbrough
— —
— — — high High ActiveActive Now Started: —
Ends: —Footway Surface Treatment.
Footway closure: Alternative route will be provided Liverpool
— —
— — — high High ActiveActive Now Started: —
Ends: —Emergency road closure required for sewer repairs. Manchester
— —
— — — high High ActiveActive Now Started: —
Ends: —Temporary road closure to allow road patching and surfacing works Middlesbrough
— —
— — — high High ActiveActive Now Started: —
Ends: —Temporary Road Closure Middlesbrough
— —
— — — high High ActiveActive Now Started: —
Ends: —Road closure to conduct carriageway/footway resurfacing Manchester
— —
— — — high High ActiveActive Now Started: —
Ends: —ROAD CLOSURE IS REQUIRED FOR SAFE POLE TESTING ALONG WITH TREE CUTTING. Gloucester
— —
— — — high High ActiveActive Now Started: —
Ends: —Temporary road closure Middlesbrough
— —
— — — high High ActiveActive Now Started: —
Ends: —Temporary road closure
Grasmere Road, Darlington Middlesbrough
— —
— — — high High ActiveActive Now Started: —
Ends: —JB Saw cut out and fill pothole (Perm C/W Pothole 100mm/1.0m2) (reactive maintenance repair).
Footway closure: Alternative route will be provided Warrington
— —
— — — high High ActiveActive Now Started: —
Ends: —Temporary road closure Middlesbrough
— —
— — — high High ActiveActive Now Started: —
Ends: —footway defect patch repair
Footway closure: Alternative route will be provided Warrington
— —
— — — high High ActiveActive Now Started: —
Ends: —Ellesmere Port Active Travel Scheme.
Footway closure: Alternative route will be provided Liverpool
— —
— — — high High ActiveActive Now Started: —
Ends: —MEWP to be sited to allow access to Tesco signage for maintenance checks. Cycle lane closure required. Manchester
— —
— — — high High ActiveActive Now Started: —
Ends: —