LANE CLOSURE, B23, Hillhall Road , Lisburn

Last updated: 31 August 2026

Permit Details

Scheduled Start
Wed 26 Aug at 13:24
Scheduled End
—
TTRO Required
No
Source
transport_ni
Description
Lane Closure required for NI Water - replace or relevel SV AV FH box. Closure to operate: Off-peak. Traffic control to operate, delays expected.

TrafficWatchNI © Crown copyright, OGL v3.0.

Loading map…

Preparing the interactive map.

Dates

StartWed 26 Aug at 13:24
End—

Get Alerts

This closure is recorded on a local street. A matching nearby area is selected when one is available.

🛣

Verifying you’re human…

Enter your email address. Choose a road. The human check is still loading.